EasyManua.ls Logo

CLIVET WiSAN-YEE1 55.4 User Manual

CLIVET WiSAN-YEE1 55.4
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
M0
I400002-00 02-23
WiSAN-YEE
45.4 - 85.4
Manual
for installation
use and maintenance

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the CLIVET WiSAN-YEE1 55.4 and is the answer not in the manual?

CLIVET WiSAN-YEE1 55.4 Specifications

General IconGeneral
BrandCLIVET
ModelWiSAN-YEE1 55.4
CategoryHeat Pump
LanguageEnglish

Summary

Safety Considerations and User Guidance

Safety and Risk Management

Covers general safety regulations, protection devices, and risk mitigation during operations.

Refrigerant Gas Information

Pre-Installation Procedures

Delivery Reception and Inspection

Checks to perform upon delivery to ensure unit integrity and correct materials.

Installation Site Selection

General Site and Space Requirements

Criteria for selecting an installation location, including altitude and clearances.

Positioning and Airflow

Recommendations for unit placement and ensuring adequate airflow for optimal performance.

Water Connections

Hydraulic System and Water Quality

Guidelines for hydraulic system design and required water quality parameters.

Freezing Protection and Water Flow

Freezing Protection and Water Flow

Measures to prevent freezing and requirements for water flow rates.

Water Filter and Operation Sequence

Electrical Connections

Electrical Data and Requirements

Unit electrical specifications and power supply network requirements.

Customer Terminal Connections

Keypad and Modbus Communication

Start-up Procedures

Start-up Overview

Operations performed by qualified technicians. Agree start-up data with service centre.

Unit Control System

Unit Status and Alarms

Alarm Codes and Descriptions

List and description of alarm codes generated by the unit.

R32 Gas Safety Warnings

Area Checks and Work Procedures

Safety checks for area preparation and controlled work procedures for flammable refrigerants.

Refrigerant Handling and Ignition Sources

Precautions for handling refrigerant, avoiding ignition sources, and ventilation.

Leak Detection and Refrigerant Removal

Methods for detecting leaks and procedures for removing refrigerant safely.

Charging and Component Repair Safety

Safety guidelines for refrigerant charging and repairing sealed components.

Dismantling and Refrigerant Management

Maintenance Procedures

Safety and General Maintenance

General safety rules, maintenance responsibilities, and inspection frequency.

Decommissioning and WEEE

Residual Risks

General and Handling Risks

Identification of general risks and risks associated with unit handling.

Installation and General Risks

Risks related to installation, placement, and general operational hazards.

Electrical and Moving Part Risks

Hazards associated with electrical components and moving parts.

Refrigerant and Hydraulic Risks

Risks related to refrigerant handling and hydraulic system defects.

Unit in Modular Configuration

Modbus Communication

RS-485 Specifications

Communication protocol, speed, data bits, parity, and stop bits for Modbus.

Related product manuals