Table of Contents

Question and Answer IconNeed help?

Do you have a question about the CLIVET WiSAN-YEE1 80.4 and is the answer not in the manual?

CLIVET WiSAN-YEE1 80.4 Specifications

General IconGeneral
CategoryHeat Pump
ModelWiSAN-YEE1 80.4
Cooling Capacity80.4 kW
Power Supply400V / 3Ph / 50Hz
RefrigerantR410A
Dimensions (LxWxH)1100x2100 mm

Summary

Safety Considerations

1.1 General Safety Practices

General safety principles and required protective equipment for operation.

1.4 Intended Use and Risks

Specifies authorized applications, hazards, and unqualified personnel risks.

1.5 Installation and Maintenance

Guidelines for unit installation, positioning, and planned maintenance.

Refrigerant Gas Information

Refrigerant Characteristics

Details on the refrigerant type, safety class, and global warming potential.

Pre-Installation Procedures

4.1 Reception and Checks

Checks before delivery acceptance and handling anomalies.

4.4 Unit Handling and Storage

Safety precautions and equipment for handling and storing the unit.

Installation Site Selection

5.1 General Positioning and Airflow

General guidelines, altitude, positioning, and airflow requirements for installation.

Water Connections

6.1 Hydraulic System and Quality

Design of hydraulic pipes and acceptable water quality parameters.

6.10 Flow Switch and Filters

Role of flow switch and installation requirements for water filters.

7. Electrical Connections

7.3 Power Supply Requirements

Specifications for the power supply network and line requirements.

Start-up Procedures

Start-up Operations

Requirements for qualified technicians to perform start-up operations safely.

Start-up Sequence (Pre-Power)

8.1 Pre-Power Checklist

Checklist of items to verify before unit power supply is switched on.

Start-up Sequence (Post-Power)

8.2 Post-Power Checklist

Checklist of procedures to follow once the unit power supply is ON.

9. Control Panel Operation

Control Alarms

9.16 Alarms

Table of alarm codes and their associated error descriptions.

10. R32 Gas Safety Warnings

10.1 Area Checks and Procedures

Safety checks and procedures for working with flammable refrigerants.

10.6 No Ignition Sources

Prohibition of ignition sources during operations with flammable refrigerants.

R32 Gas Safety Continued

10.13 Leak Detection and Removal

Methods for leak detection and procedures for refrigerant removal.

10.15 Charging Operations

Requirements for charging operations with flammable refrigerants.

11. Maintenance

11.1 Safety and General Maintenance

Safety precautions and overview of maintenance tasks by qualified personnel.

13. Decommissioning and WEEE

13.1 Disconnection Safety

Safety warnings and procedures for unit disconnection.

14. Residual Risks

14.1 General and Handling Risks

Overview of common risks, including those from handling.

14.5 Electric Parts Risks

Hazards related to electrical connections, components, and earthing.

Residual Risks Continued

14.6 Moving Parts and Refrigerant Risks

Risks from moving parts, refrigerant handling, and heat sources.

15. Unit in Modular Configuration

16. Modbus Communication

16.1 Communication Specifications

Protocol, speed, and data bit settings for Modbus RS-485 communication.