EasyManua.ls Logo

clivus multrum CM8 - Page 7

Default Icon
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
go green pay less no mess
5. TOOLS & MATERIALS REQUIRED.
5.1 TOOLS REQUIRED:
» Spirit level
» Scissors or cutting knife
» Screwdriver (Philips head and plain)
» Jigsaw (an angle grinder or a drill can also be used to
cut large holes).
» Please use safety glasses.
» Dri l l
» Tape measure
» Caulking gun
» Felt tip or crayon marker
» Masonry drill and bit (if installing onto concrete floor)
» Spade
» Ladder
5.2 MATERIALS REQUIRED:
» Starter bulking material (if not purchased from Clivus).
See Section 14.
» Water for wetting starter material.
» Timber for tank rear support if required.
» Additional 40 mm PVC pipe, couplings and bends if
absorption trench is to be located some distance away
from tank.
» In poor soil conditions, extra length of trenching arch
may be required (500 x 230mm)
» Pipe bends if needed for vent pipe.
In addition, if the Vent & Drain Kit was not purchased with
your unit you will need:
» 150mm vent pipe lengths to suit (DWV class is
recommended).
» Vent pipe supports and wall/roof flashings to suit.
» 40mm DWV pipe and fittings to connect to a sullage
disposal system.
PAGE 6