FORWORD
Thank you for choosing a CMC product. Your new CMC Typhoon Tower was
engineered to provide you with the ultimate wake boarding/skiing experience.
Each part of the Typhoon Tower has been precision machined from the highest
quality material to ensure trouble free service. When installed properly, your
Typhoon Tower will provide years of enjoyment, please take time to pay great
attention to detail during installation. Your patience will be rewarded with great
wake board/skiing performance and a super new look for your boat.
INSTALLATION
Before beginning the installation of your new tower, please read through these
instructions completely. We have provided photos of various steps of the
installation process.
Your Typhoon Tower has been packaged with great care to prevent any damage
and to guarantee that all required parts are included. For proper installation the
following items should be included in your Typhoon Tower box:
ITEM #9500 TYPHOON TOWER
1. One 9572 header assembly
2. One 9577 port rear tube assembly
3. One 9579 starboard rear tube assembly
4. One 9581 port front tube assembly
5. One 9583 starboard front tube assembly
6. One 9585 rack assembly
7. Eight 9557 wear plates
8. Two 9541 brace plates
9. One 9553 all-round pedestal white light w/black body
10. Three 6039 6-32 x ¾” Phillips pan head type F tapping screws
11. One 9554 18-4 shielded cable x 20’
12. One 9551 Typhoon Tower panel decal
13. Two 9587 brace plate decals
14. Four 9588 tube decals
15. Four 9552 shock cord assemblies
16. Four 9591 ¼” - 20 x 2 1/2” socket button head cap screws
17. Four 9326 ¼” – 20 hex cap nuts
18. Four 6041 ¼” lock washers
2