EasyManua.ls Logo

CMP DEL AOP-S - Section 3 Operation; Pre-Operation Preparation

CMP DEL AOP-S
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
SECTION 3 Operation
Figure 3: Flow Test Diagram
SECTION 3 Operation
3A. General
To achieve optimal performance from the DEL AOP-S, the pool must
be as clean as possible to start with.
1. Backwash or clean filters one day before starting the AOP-S.
2. Superchlorinate pool water using a chlorine based shock
treatment.
3. Test pool chemistry and adjust pH between 7.4 and 7.6.
Adjust total alkalinity between 80 and 120 ppm.
4. Run pool filtration continuously for 24 hours prior to starting
AOP System.
Flow Meter Assembly

Related product manuals