EasyManua.ls Logo

Cobra CJIC 550 - Inflating Tires; Inflating Small Sports Equipment

Cobra CJIC 550
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
Operation
12
Inating tires
Caution:
If the pressure gauge on the compressor indicates more than twice the
recommended pressure for the object you are inating and you have only
started to inate the object, the valve connector is incorrectly connected
to the valve stem. This may damage the power pack with air compressor.
Remove and reattach the valve connector to the valve stem.
To inate your vehicle, motorcycle, or bicycle tires:
1. Locate valve connector.
2. Remove from storage and uncoil hose.
3. Remove valve stem cap from tire to be inated.
4. Put the thumb latch in the OPEN position.
5. Insert the desired adapter into the valve connector.
6. Place valve connector rmly and completely over valve stem on the tire.
7. Press the thumb latch toward the house until it locks into the
closed position.
8. Insert into the valve receptacle on the item to be inated.
9. Press the compressor switch to turn the compressor ON.
10. Inate to desired pressure.
11. Press the compressor switch to turn the compressor OFF.
12. Remove the valve connector from the valve receptacle.
13. Put the thumb latch in the OPEN position.
14. Remove the adapter.
15. Double-check the air pressure with a pressure gauge.
16. Replace valve stem cap.
17. Store the valve connector.
13
Inating small sports equipment
You can use the compressor to inate small sports equipment such as balls
(soccer balls and footballs.)
Caution:
The unit cannot be used to inate large capacity inatables such as oat
tubes, large air mattresses, transport truck tires, and inatable boats. These
types of products require extended inating times, which may damage the
compressor.
To inate small sports equipment:
1. Choose the appropriate nozzle adapter.
2. If an adapter is required, insert the nozzle adapter into the valve
connector, turning it clockwise to tighten, and close the thumb latch.
3. Place the valve connector fully on the valve stem or into the valve
receptacle on the item to be inated.
4. Turn the compressor ON and inate to appropriate pressure.
5. Turn the compressor OFF before removing valve connector from the
valve stem.
6. Remove nozzle adapter from the valve connector and store in storage
compartment of Accessory Bag.
Caution:
Allow the compressor to cool down for 10 minutes after each 10 minutes of
continuous operation. Repeat if necessary.
Note: Leave the thumb latch in the open position for storing to relieve
pressure on the internal mechanism.

Related product manuals