EasyManua.ls Logo

Coinco CoinPro 3 User Manual

Coinco CoinPro 3
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Coinco 9302-GX SERIES
ELECTRONIC CHANGER
Operation and Service Manual
Question and Answer IconNeed help?

Do you have a question about the Coinco CoinPro 3 and is the answer not in the manual?

Coinco CoinPro 3 Specifications

General IconGeneral
Coin Typesquarters, dimes, nickels
ConnectivityRS-232
Audit DataYes
Coin InputManual or automatic
Coin OutputManual or automatic
Communication InterfaceRS-232
Operating Temperature32°F to 104°F (0°C to 40°C)

Summary

General Information

Introduction to CoinPro 3 Manual

Provides an overview of the manual's purpose and scope for owners and technicians.

For Your Records

Instructions on locating and using the model and serial number for service.

CoinPro 3 Features

Lists key capabilities and design aspects of the CoinPro 3 changer.

After Unpacking Procedures

Guidance on inspecting for shipping damage and retaining packaging.

Changer Specifications

Details technical specifications including power, temperature, dimensions, and weight.

Installation Guide

Installing the Coin Changer

Step-by-step instructions for physically installing the coin changer into a vendor.

Option Switch Settings

Explains how to configure the changer's functionality using internal switches.

Operation of the Coin Changer

Coin Handling and Acceptance

Describes how coins are recognized, validated, and how rejected coins are managed.

Accepted Coin Routing

Details how accepted coins are directed to coin tubes or the cash box based on inventory.

Credit Accumulation and Payout

Explains how credit is accumulated, how vending works, and how coins are dispensed.

Change Management and Control

Covers coin storage, correct change logic, escrow return, and inventory status.

Interface with Vendor/Controller

Illustrates the connection and communication protocol between the changer and the vendor.

Maintenance Procedures

Routine Maintenance Schedule

Guidelines for regular upkeep to ensure optimal performance and lifespan.

Removing Module Assemblies

Instructions for safely detaching and replacing key internal components.

Payout Assembly Disassembly

Steps to access and remove the coin payout mechanism for service.

Cleaning Procedures

Proper methods for cleaning the changer's exterior and internal coin paths.

Clearing Coin Jams

Steps to safely remove obstructions and resolve coin jamming issues.

Bench Check Procedure

Bench Check Procedure Overview

Step-by-step guide using a Coinco Tester to verify changer functionality.

Tester Error Codes

Explains common error codes displayed by the tester and their meanings.

Troubleshooting Guide

Troubleshooting Common Issues

A systematic guide to diagnose and resolve common operational issues.

Wiring Diagram and Connections

Visual representation of the internal electrical connections for diagnostic purposes.

Exploded Views

Modular View Components

An overall breakdown of the changer's main components with item numbers.

Changer Housing Components

Detailed view and parts list for the main structural housing.

Payout Assembly Details

Exploded view and part numbers for the coin dispensing mechanism.

Acceptor Front View

Detailed exploded view and part list for the front of the coin acceptor.

Acceptor Back View

Detailed exploded view and part list for the back of the coin acceptor.