IF-153 Rev. B
Lockout Lever Kit for
Master Disconnect Switch
24505 for 5/16” shackle locks
24505-01 for 7mm shackle locks
This kit may be used with all Cole Hersee
metal
lever-activated master Disconnect
Switches with a 3/4 diameter mounting stem.
Use this kit to secure the switch in the
Off position with a padlock. Such
lockout procedures may be required by
regulations, particularly in situations
where moving machinery might be
accidentally turned on causing risk of
injury.
In Package
Locking Lever
Bracket
10-32x3/8” Screws (2)
Installation
1. Make sure that the switch is in the off position
2.
Warning
Disconnect all battery cables from
the battery before attempting to install this
product
3. Remove the lever from the switch. Retain the
existing screw and lock washer as these are
required to attach the locking handle
4. Remove the hex nut and lock washer from the
mounting stem
5. Place the bracket over the stem
6. Replace hex nut on mounting stem and tighten
only finger tight
7. Put The locking handle on the switch and
replace lock washer and screw from original
lever. Tighten finger tight
8. Rotate bracket until the hole in handle lines up
with the hole in the bracket.
9. Mark the center of the mounting screw holes
10. Remove the handle with screw and lock washer
OFF
ON
Notch for
Anti-Rotation
Stud
Hole for Switch
Mounting Stem
Mounting Screw
Holes
Notch for
Indexing Pin
Question and Answer IconNeed help?

Do you have a question about the Cole Hersee 24505 and is the answer not in the manual?

Cole Hersee 24505 Specifications

General IconGeneral
BrandCole Hersee
Model24505
CategoryIndustrial Equipment
LanguageEnglish

Summary

Lockout Lever Kit for Master Disconnect Switch

In Package

Installation Instructions

Other Cole Hersee Battery Management Products