EasyManua.ls Logo

Component Playgrounds PH45 - Playhouse Assembly Procedures; Playhouse Platform Assembly

Component Playgrounds PH45
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
©January 1, 2010 Swings & Things Inc.
5’ Playhouse Assembly and Installation Instructions
1.Assemble the platform.
a. Mark the support plates as shown in Side View.
b. Drill 3/8” pilot holes at each mark.
c. Assemble des supports as shown in Deck Support View.
d. Attach boards A and B fi rst. Evenly space the remaining boards (about ¾” apart) and attach to the support plates using
the 2 ½” grabber screw. Refer to Top View.
e. The platform should just square its self up as it is assembled. However, you should verify that the platform is square
before continuing on with the assembly.
e1. How to determine if your platform is square: Use a tape measure. Determine the diagonal corner to corner measure-
ment. Verify that measurement with the opposite diagonal corner to corner measurement. Within a small margin of error,
these two measurements should be the same.