EasyManua.ls Logo

Component Playgrounds PH45 - Page 6

Component Playgrounds PH45
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23. Measure the height of the top rail to insure proper swing height.
24. Check the level of the entire structure and adjust as necessary.
25. When you are satised that the structure is level, mix and pour the concrete according to the package directions. You
will use approximately seven 80# bags in the ladder hole and 1 ½ bags in each of the leg holes.
26. Allow the concrete to cure completely before using your swing set. (3-5 days).
27. Attach chains and swinging items and enjoy your Component Playground.