EasyManua.ls Logo

Connecticut Electric EmerGen Switch A series User Manual

Connecticut Electric EmerGen Switch A series
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
EmerGen Switch
EmerGen Switch
®
®
Manual Transfer Switch
OWNER’S MANUAL AND
INSTALLATION INSTRUCTIONS
For “A” Series Models 6-5001, 6-7501, 10-7501, 10-12K1
PLEASE READ THIS MANUAL IN ITS ENTIRETY
BEFORE
INSTALLING AND/OR OPERATING YOUR
EmerGen Switch
EmerGen Switch
®
®
RETAIN THIS MANUAL FOR FUTURE REFERENCE
Congratulations on the purchase of your new
EmerGen Switch
EmerGen Switch
®
®
Corporate Office: 5508 - 128th St. E, Puyallup, WA 98373, Ph. 1(800) 472-3819, Fax (253) 471-9540
Sales / Engineering: 425 Sycamore St., Anderson, IN 46016 Ph. 1(800) 730-2557, Fax (765) 608-5036
Question and Answer IconNeed help?

Do you have a question about the Connecticut Electric EmerGen Switch A series and is the answer not in the manual?

Connecticut Electric EmerGen Switch A series Specifications

General IconGeneral
Amperage30 A
Voltage120/240 V
Poles2
Maximum Generator Wattage7500 W
TypeManual Transfer Switch
Current Rating30 A
MountingSurface
CompatibilityGenerators
Warranty1 Year Limited
PhaseSingle

Summary

Product Specifications and Warnings

Product Specifications

Technical details and ratings for different EmerGen Switch models.

Installation Warning

Critical safety warning about potential damage or injury from improper installation.

Safety and Generator Use

Safety Information

Essential safety precautions for using the EmerGen Switch and generator.

Generator Safety Guidelines

Guidelines for safe generator operation and connection with the switch.

Installation Process

Installation Preparation

Steps to prepare for installing the EmerGen Switch, including circuit selection.

Wiring the EmerGen Switch to the Load Center

Detailed instructions for connecting the switch wires to the load center circuits.

Installing 240 Volt (2 pole) Circuits

Specific procedure for wiring 240-volt appliances using dual pole circuits.

Completing the Installation

Final steps to complete the installation, including neutral and ground connections.

Wattage Requirements

Operation and Troubleshooting

Operation and Test Procedure

Step-by-step guide for operating and testing the EmerGen Switch.

Load Management

Guidance on balancing electrical loads and managing circuit breaker trips.

Trouble Shooting

Common problems, their causes, and solutions for the EmerGen Switch.

Product Warranty

Related product manuals