EasyManua.ls Logo

Construction Solutions DBX1000 - User Manual

Default Icon
2 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Construction Solutions
7801 E. Gray RD Suite 110 Ph: (480)346-8240
Scottsdale, AZ 85260 Fax: (480) 346-8250
www.newconstructionsolutions.com
DBX1000 Recessed Vent Receptacle
Installation Guidelines &
Product Information
Material used in the DBX 1000 meets UL94 HB Flammability Testing and is recognized by Underwriters Laboratories Inc.
Representative samples of this component have been evaluated by UL and meet applicable UL requirements.
For optimum results, install the DBX1000
®
recessed vent receptacle for 4 Inch Walls as follows:
Box Installation - 16 Inch On-Center Spacing:
1. Orient box to match desired venting direction, score & remove appropriate top or rear 4-inch oval vent pipe
knock out. Allow minimum of 4 inches of vent of pipe to extend inside box
2. If gas line is to be installed, locate 1straw clamp on top of box. Cut the webs between the 8 fins with a
utility knife. Push the gas line through the straw clamp. The fins will flex inward holding the pipe.
3. Slide box into position taking care to correctly align vent pipe and gas pipe (if present).
4. Spacing tabs will automatically position box so that bottom, inside edge is from to 2⅝ inches above
unfinished floor to allow clearance between trim ring and finished floor covering. Tabs may be removed if a
different spacing is desired.
5. Attach box directly to both right and left studs using the six flange screw holes. Screws are recommended for
mounting.
Box Installation - 24 Inch On-Center Spacing:
1. Orient box to match desired venting direction, score & remove appropriate 4-inch oval vent pipe knock out.
Allow minimum of 4inches of vent of pipe to extend inside box.
2. If gas line is to be installed, locate 1⅝ straw clamp on top or bottom of box. Cut the webs between the 8 fins
with a utility knife. Push the gas line through the straw clamp. The fins will flex inward holding the pipe.
3. Slide box into position taking care to correctly align vent pipe and gas pipe (if present).
4. Spacing tabs will automatically position box so that bottom, inside edge is from to 2⅝ inches above
unfinished floor to allow clearance between trim ring and finished floor covering. Tabs may be removed if a
different spacing is desired.
5. Attach one side of box directly to stud using the three flange screw holes.
6. Snap in the two mounting straps on the other side of the box and attach these to the second stud using the
strap screw holes. Screws are recommended for mounting.
Trim Instructions:
1. Snap out left or right trim ring “cut out” (see detail below).
2. Leave 1¾ inches between inside edge of box and
end of baseboard to allow for trim ring clearance.
3. Snap trim ring into opening, no caulking required.
4. Leave unfinished or paint with desired color.
Snap On Trim Ring
Box made from High Impact Polystyrene (“HIPS”)
Meets UL94 HB Flammability Testing
Install in up to 24” on center location, brackets included
Easy to remove 4” oval knockouts
Top and Bottom Straw clamps for gas pipe
Snap on trim ring accommodates up to ¾” drywall
US Patented Product 6,938,640
¼”
17
17
13¾
1¾
13¾
1
Top Oval Clearance
Notches
¼”
17
17
13¾
1¾
13¾
1
¼”
17
17
13¾
1¾
13¾
1
¼”
17
17
13¾
1¾
13¾
1
Top Oval Clearance
Notches
Question and Answer IconNeed help?

Do you have a question about the Construction Solutions DBX1000 and is the answer not in the manual?

Summary

Box Installation - 16 Inch On-Center Spacing

Orient Box and Remove Vent Pipe Knockout

Orient box, score & remove 4-inch oval vent pipe knock out. Allow 4 inches of pipe to extend inside.

Gas Line Installation with Straw Clamp

Install gas line using straw clamp; cut webs between fins to hold pipe. Fins flex inward.

Position Box and Align Pipes

Slide box into position, aligning vent pipe and gas pipe.

Utilize Spacing Tabs for Floor Clearance

Spacing tabs position box 2-2.5 inches above unfinished floor for trim clearance. Tabs can be removed.

Secure Box to Studs

Attach box directly to both right and left studs using six flange screw holes. Screws recommended.

Box Installation - 24 Inch On-Center Spacing

Orient Box and Remove Vent Pipe Knockout

Orient box, score & remove 4-inch oval vent pipe knock out. Allow 4 inches of pipe to extend inside.

Gas Line Installation with Straw Clamp

Install gas line using straw clamp; cut webs between fins to hold pipe. Fins flex inward.

Position Box and Align Pipes

Slide box into position, aligning vent pipe and gas pipe.

Utilize Spacing Tabs for Floor Clearance

Spacing tabs position box 2-2.5 inches above unfinished floor for trim clearance. Tabs can be removed.

Attach Box to One Stud

Attach one side of box directly to stud using the three flange screw holes.

Use Mounting Straps for Second Stud

Snap mounting straps on other side and attach to second stud using strap screw holes. Screws recommended.

Trim Instructions

Snap Out Trim Ring Cut Out

Snap out left or right trim ring 'cut out' as shown in detail.

Ensure Baseboard Clearance

Leave 1-3 inches between inside edge of box and end of baseboard to allow for trim ring clearance.

Snap Trim Ring into Opening

Snap trim ring into opening; no caulking is required.

Finish Trim Ring

Leave unfinished or paint with desired color.

Construction Solutions DBX1000 Specifications

General IconGeneral
BrandConstruction Solutions
ModelDBX1000
CategoryFan
LanguageEnglish