Form No. 265283 Rev. 07/08
1
CAUTION - Before performing any service
operation on any pump, be sure that all
pressure has been relieved from BOTH
SIDES of the system.
CAUTION - Before performing any service
operation on any pump, disconnect or lock
off power supply.
CAUTION - Before starting pump, be sure
that any resulting machine function will not
endanger persons or equipment.
PRODUCT IDENTIFICATION
Each pump has an Ordering Code stamped on its
nameplate. See below for the location of the Ordering
Code.
This service manual applies to products with Ordering
Codes like the sample below.
INSTALLATION
PUMP DRIVE AND MOUNTING
When mounting the pump and motor, care must be
taken to align the pump and motor shafts within .003
T.I.R. (0.076 mm) direct inline through a jaw type/
flexible web coupling. This is recommended for all
pumps. Tire-type flexing elements and chain-type
drives are not recommended. With belt drives, please
consult factory.
To avoid axial and radical end loading of the pump
shaft, do not couple the pump and motor shafts
rigidly. Allow freedom at the coupling for the two
shafts to ride independently.
To prevent end loading, the space between the pump
and motor shaft ends should be 3/4 inch (19.05 mm)
for PVR15 pumps, or as the coupling manufacturer
specifies.
PIPING AND RESERVOIR
The pump should be mounted with a minimum
number of elbows or fittings. The pump suction
should be at least 1-1/4 inch (31.75 mm) tube/pipe for
PVR15 pumps.
For any system and combination of piping except
High Water Based Fluids (HWBF), the vacuum at the
pump inlet must not exceed seven inches of Mercury,
(5 inch Hg. for fire resistant fluids). HWBF Pumps are
to have a positive inlet head in the range of 0.5-inch
Hg. to 20 inch Hg.
SERVICE MANUAL
PVR15-30B-Flanged Series Pump
Installation, Startup, Operating Instructions, Parts Pages, Repair Procedures
“D” Design Series
Basic Pump
Pump Size
& Pressure
Rotation & Mounting
Seal Type
Mechanical Options
Control Options
Design Letter
PVR15 - 30B15 - RF - _ - 5 - _ _ _ _ _ - D
Question and Answer IconNeed help?

Do you have a question about the Continental Hydraulics PVR15-30B-Flanged Series and is the answer not in the manual?

Continental Hydraulics PVR15-30B-Flanged Series Specifications

General IconGeneral
SeriesPVR15-30B-Flanged
Maximum Flow Rate30 GPM
Maximum Pressure3000 PSI
Weight45 lbs
RotationClockwise

Summary

INSTALLATION

PUMP DRIVE AND MOUNTING

Align pump and motor shafts within .003 T.I.R. using flexible coupling. Avoid end loading.

PIPING AND RESERVOIR

Use minimum elbows, 1-1/4" suction line, observe vacuum limits, and HWBF requirements.

PRODUCT IDENTIFICATION

STARTUP PROCEDURES

SAFETY AND OPERATING PRECAUTIONS

Crucial cautions for pump installation, startup, and operation to prevent hazards.

OPERATION

PRESSURE AND VOLUME ADJUSTMENTS

How to adjust pressure and volume controls for optimal pump performance.

ADJUSTMENT PROCEDURES

PVR15-30B KITS AND PARTS

PVR15-30B PARTS LIST

PVR15-30B PARTS DRAWINGS

PVR15-30B CONTROL OPTIONS DRAWING

PUMP REPAIR PROCEDURES

DISASSEMBLY PROCEDURE

Step-by-step guide to safely take apart the hydraulic pump for maintenance.

REASSEMBLY PROCEDURE

Detailed steps for correctly reassembling the pump, including bushing and vane installation.

PUMP REPAIR PROCEDURES (CONTINUED)