EasyManuals Logo

Contracor DBS-100 User Manual

Default Icon
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
6
CONTRACOR
®
Version 2.0
ENGLISH
3. Set-up, operation and shut-down.
3.1. Preparation for operation.
1. Ensure that compressor is positioned out of the abrasive blasting operation zone on
downwind side.
2. Start compressor and increase pressure and temperature up to operational values.
3. Open lower ball valve at machine compressed air line (the handle of the open valve
should be parallel to the compressed air line).
4. Open the tank venting ball valve.
5. Close compressed air feed ball valve (upper ball valve on the compressed air line).
6. Close metering valve FSV by setting adjusting handle in the central position.
7. Connect compressed air hose to coupling of the machine. Compressed air hose
diameter should be at least 1.25”. Lock hose coupling with a safety clip or wire.
8. Connect abrasive blasting hose to hose coupling of the machine. Lock hose coupling
with a safety clip or wire.
9. Fill the machine tank with abrasive.
10. Put protective equipment on.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Contracor DBS-100 and is the answer not in the manual?

Contracor DBS-100 Specifications

General IconGeneral
BrandContracor
ModelDBS-100
CategoryShot Blasting Machines
LanguageEnglish