EasyManua.ls Logo

Conviron GEN1000-GE User Manual

Default Icon
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
GEN1000-GE
OPERATOR MANUAL
291180-ENG
R00

Table of Contents

Questions and Answers:

Conviron GEN1000-GE Specifications

General IconGeneral
ModelGEN1000-GE
TypePlant Growth Chamber
Humidity Range40% to 95% RH
ApplicationPlant growth and environmental simulation
Intended UseControlled environment for plant growth
Temperature Range4°C to 45°C
LightingLED
Light IntensityUp to 1000 μmol/m²/s
CO2 ControlOptional
Interior Dimensions100 cm x 80 cm x 180 cm
Power Supply220-240V, 50/60Hz

Summary

Preface

Latest Manual Versions and Languages

Information on obtaining the latest manual versions and languages.

Functional Description/Intended Use

Describes the intended use of the chamber for controlled environments.

Precautions

Hazard Identification Symbols

Explanation of hazard symbols used in the manual for safety.

General Precautions

General safety guidelines and warnings for operating the chamber.

Chamber Features

Control System

Details the advanced programming and monitoring capabilities of the control system.

Air Intake and Exhaust

Describes the adjustable fresh air intake and exhaust ports for air exchange.

Humidity Control

Explains the ultrasonic humidifier and its humidity control capabilities.

Instrumentation Ports

Details the 2" access port for inserting instruments and monitor leads.

Network Connectivity

Describes the RJ45 connection port for facility network connection.

Levelers

Explains the use of levelers for stabilizing the chamber.

Central Alarm Contact

Describes the normally closed dry contact for alarm notifications.

Central Management System (Optional)

Details optional features for remote control and monitoring of chambers.

CMP-Link (Optional)

Explains CMP-LINK for full interaction with Conviron chambers.

Hardware Options

Lists optional factory-installed hardware features for the chamber.

Customer Installed Options

Details options that can be ordered and installed by the customer.

Installation

Install the Chamber

Guidance on installing the chamber in a suitable environment.

Chamber Clearance

Specifies required clearance around the chamber for ventilation and access.

Power Supply

Details power supply requirements and voltage tolerance.

Water Supply

Specifies water supply parameters and quality requirements for the chamber.

Condensate Drain

Describes the condensate drain and options for condensate management.

Remove the Chamber from the Shipping Pallet

Instructions for safely removing the chamber from its shipping pallet.

Move the Chamber into Final Position

Guidance on moving the chamber to its final installed location.

Level the Chamber

Instructions on how to properly level the chamber using its adjustable feet.

Airflow

Explains the importance of airflow and how it is managed within the chamber.

Adjustable Wire Shelves

Details how to install and adjust wire shelves and seedling trays.

Adjustable Shelf Spacing

Provides guidelines for setting shelf spacing based on the number of shelves.

To install wire shelves

Step-by-step instructions for installing shelf support brackets and wire shelves.

To install the optional seedling tray

Instructions for sliding the seedling tray onto the wire shelf.

To remove a wire shelf

Procedure for removing a wire shelf from its support brackets.

To remove a wire shelf support bracket

Steps to detach a shelf support bracket from the chamber pilaster.

Connect the UPS, Communication, and Central Alarm Contact

Guides on connecting UPS, communication, and alarm contacts on the rear panel.

Connect the Electrical Cord

Instructions for connecting the main power cord, including safety precautions.

Start Up

Power ON

Pre-power on checks and procedures for turning on the chamber.

Start-Up Procedure

Step-by-step guide for powering on the chamber and control system.

Visual Checks

Procedures for performing visual checks after start-up to ensure proper operation.

Operation

Control and Monitoring

Overview of the CMP6060 controller for operation and monitoring.

Fluorescent and LED Lighting

Description of the lighting systems and how their operation is logged.

Lighting Options

Details the chamber's compatibility with fluorescent and LED lighting fixtures.

Fluorescent Lighting

Description of the standard fluorescent lighting configuration.

LED Lighting – LED Option

Highlights advantages of LED lighting options for the chamber.

Aspirator

Explains the function of the aspirator in monitoring temperature and humidity.

Instrumentation Port

Details the instrumentation port for connecting probes and hoses.

Fresh Air Inlet and Exhaust Ports

Instructions on adjusting fresh air inlet and exhaust ports for air exchange.

Fan Speed Control

Information on adjusting the fan speed for chamber operation.

Germination Material Placement

Guidance on placing germination materials based on shelving configuration.

Central Management System – CMS Option

Reference to the manual for CMS option operation.

Shutdown

Procedures for shutting down the chamber for short or long periods.

Maintenance

Disconnecting the Power before Maintaining or Servicing the Chamber

Steps to safely disconnect power before performing maintenance.

Cleaning the Chamber

Instructions for cleaning the interior and exterior of the chamber.

Replacing Lamps

Procedure for inspecting and replacing fluorescent or LED lamps.

To remove the lamp fixture and access the lamp tube

Steps to remove lamp fixtures and access the lamp tubes for replacement.

To replace a fluorescent or an LED lamp

Instructions for unlocking, installing, and disposing of lamps.

To re-install the lamps

Steps for reassembling the lamp fixture and tube.

Calibrating the Temperature and Humidity Sensor

Recommendation for yearly calibration of temperature and humidity sensors.

Performing Maintenance in the Machine Compartment

Procedure for accessing and performing maintenance in the machine compartment.

Maintaining the Optional Ultrasonic Humidity System (USH)

Instructions for cleaning and maintaining the USH box and ceramic discs.

To replace the ceramic discs

Steps for ordering and replacing ceramic discs in the USH system.

Adjusting the Door

Guidance on adjusting the chamber door and gasket for proper sealing.

Cleaning the Optional Condensate Pump and Condensate Pan

Procedure for cleaning the condensate pump and pan.

Cleaning the Fresh Air Inlet Filter

Instructions for inspecting and cleaning the fresh air inlet filter.

Troubleshooting

Troubleshooting the Chamber

General troubleshooting steps for common chamber operational issues.

Fuse Schedule

Lists fuses, their ratings, locations, and the components they protect.

Technical Specifications

Specifications

Details chamber dimensions, weight, power, and environmental requirements.

Power Requirements

Specifies voltage, frequency, and current requirements for the chamber.

Environmental Requirements

Defines the ambient temperature and humidity ranges for optimal operation.

Additional Information

Terms & Definitions

Provides definitions for terms and abbreviations used in the manual.