EasyManua.ls Logo

Cornell 6NHTA - Lubrication Instructions Grease Lubricated Frame Pumps

Default Icon
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Supersedes 3200-901
Aug., 2001 Mar., 2005
Cornell Pump Company
Lubrication Instructions
Grease Lubricated Frame Pumps
If frame is oil lubricated (denoted by a ‘K’ on the serial number plate and view gauge on side of frame), see
“Lubrication Instructions – Oil Lubricated Frame Pumps,” page 3200-902.
Bearing in all frames are greased at the factory before shipment.
Lubrication requirements vary with speed, power, load, ambient temperatures, exposure to contamination and
moisture, seasonal or continuous operation and other factors. The brief recommendations which follow are
general in nature and must be coupled with good judgement and consideration of the application conditions.
For regreasing periods refer to table below. When adding grease be sure the grease and fittings are absolutely
clean.
Grease used for these bearings should be equivalent to one of the following manufacturer’s products:
G.E. Long Life Grease No. D682C5
Mobil Mobilux No. EP2
Shell Alvania EP2
Texaco Multifak AFB 2
To lubricate frame bearings, remove plastic cover from zerk fittings and be sure the fitting and end of grease
gun are clean. Use hand-operated grease gun only and pump a small amount of grease into each bearing cavity.
The surplus grease will go through the bearing and into the center part of the frame.
For regreasing periods and approximate quantity, refer to table below.
First determine frame size (located on serial number plate).
Example: 5HH-65B4 4NNT-VF16 10YB-F18DB 6NHTA-VC18 4RB-EM16
RECOMMENDED REGREASING PERIODS FOR FRAMES
FRAME SIZE
2-5-11 and EM309
6-7-8-16
60B4 through 68B4
10-12-13-13D
18-18D
20-24 30
Total Running Time
2,000 hours 1,500 hours 1,000 hours 1,350 hours 2,000 hours
8-Hour Day Service
36 weeks 27 weeks 18 weeks 24 weeks 36 weeks
24-Hour Day Service
12 weeks 9 weeks 6 weeks 8 weeks 12 weeks
Approximate Amount of
Grease per Line Fitting
.5 cubic inch 1.25 cubic inch 2 cubic inches 3 cubic inches 4 cubic inches
Approximately
3 pumps with grease
gun hand operated
6 pumps 12 pumps 18 pumps
23 pumps with grease
gun hand operated