b2
WF22
k2
WD24
WD23
WD31
a3
WD25b
(5) WD24 Playhouse Wall Slat-A 1× 4×27 9/16
ITEMS NEEDED
(1) WF22 Playhouse Arched Guardrail-A 1×6×54
(1) WD31 Tower Surrounded Board-C 1× 4×6 27/32
(1) WD23 Tower Surrounded Board 1× 4×24 3/8
8STEP :
(2) WD25b Playhouse Wall Slat-C 1× 4×46 3/4
(6)
HARDWARE NEEDED
a3
d1
k1
k2
e6
e6
d1
(2)
b2
k2
a3
(4)
(28)
(2)
k1
(2)
* From the inside deck, attach five WD24 to the right of the WD25b, also on the right of the arch.
* From the inside deck, attach both WD25b, one on each side of the arch with wood screws "a3".
* Insert nut barrel "d1" into the uprights respectfully.
TOWER ASSEMBLY
* Attach WF22 to the uprights with wood screws "b2".
N
o
t
e
!
I
m
p
o
r
t
a
n
t
Keep flush the bottom
* Attach the WD23 and WD31 to the uprights with bolts "e6".
Back wall assembly
Back
(There should be no spaces).
24