EasyManua.ls Logo

Creative Engineering ROCK-A-FIRE EXPLOSION - Page 12

Default Icon
326 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PROCEDURES
FOR
POWER
UP
A.
In
the
compressor
room:
1.
Close
the
drain
valves
on
the
Compressor,
Air
Dryer
and
Receiver.
2.
Empty
the
drainage
collectors.
3.
Turn
on
the
power
to
the
Compressor
and
Air
Dryer.
(Note:
Refer
to
the
Air
Dryer
manual
as
to
constant
operation.)
(SEE
DRAWING
BELOW)
~&Mo..,.e
.....
.,
-~~~
B.
In
the
Control
Room,
clean
the
Tape
Heads,
Guides,
Pinch
Rollers
and
the
Capstan.
To
clean
these
parts
use
denatured
alcohol
or
a
name
brand
tape
head
cleaner.
C.
Power
up
the
Audio
Rack.
(NOTE:
BE
SURE
THE
AMPLIFIER
VOLUME
CONTROLS
ARE
TURNED
FULLY
COUNTER
CLOCKWISE,
OR
DOWN,
BEFORE
YOU
POWER
UP)
1.
Turn
on
the
Equalizer.
2.
Turn
on
the
tape
decks.
3.
Turn
on
the
Amplifier,
and
set
the
volume
controls
to
the
marked
levels.
D.
Rewind
the
tape
decks
#1
and
#2.
E.
Reset
the
tape
counter
to
~oooo".
1.
Run
the
tape
until
a
signal
first
appears
on
the
v.u.
meter,
channel
#4.
2.
Reset
the
tape
counter
to
"0000".
3.
Rewind
the
tape
counter
ten
(10)
counts,
the
counter
should
read
"9990".
4.
Reset
the
tape
counter
to
"0000".
F.
At
approximately
15
minutes
before
the
restaurant
opens.
1.
Push
PLAY
on
the
Dual
P.C.
Mount.
2.
After
tape
deck
#1
stops,
turn
the
"House
Light
Override
Switches"
into
the
"Computer"
mode.
1-003