EasyManua.ls Logo

Creative Engineering ROCK-A-FIRE EXPLOSION - Page 13

Default Icon
326 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
POWER
DOWN
PROCEDURES
A.
Turn
the
House
Lights
to
the
Over-ride
Mode.
B.
Turn
all
four
amplifier
volume
controls
fully
counter
clockwise
and
turn
off
power
to
the
amplifiers.
C. Turn
off
the
Equalizer.
D.
Turn
off
Tape
Decks
#1
and
#2.
E.
Turn
off
all
power
at
panel
L3.
1.
Gray
Show
Controller
2.
Stage
Flood
Lights
3.
Audio
4.
Stage
Effect
Lights
5.
Spot
Lights
6.
Drape
Motors
F.
Go
to
the
Compressor
room.
1.
Turn
off
the
Air
Dryer
2.
Turn
off
the
Compressor
G.
Empty
all
Drainage
collectors,
and
check
all
drains
for
blockage.
Open
the
Drain
Valves
on
the
Compressor,
Air
Dryer
and
Receiver
a
small
amount,
these
valves
will
remain
open
all
night.
H.
Check
the
Compressor
oil
level,
if
low
add
Non-Detergent
oil,
fill
to
the
proper
level.
(Note:
Use
30wt.
oil
in
the
colder
areas,
and
40wt.
oil
in
the
warmer
areas.)
I.
Check
the
Compressor
for
any
loose
components.
ie,
Belts,
Mounting
bolts,
fittings,
etc.,
tighten
any
found.
J.
If
any
problems
are
noted
during
the
day,
they
are
to
be
documented
and
left
on
top
of
the
Controller.
This
will
insure
that
the
person
coming
in
the
next
day
will
be
aware
of
any
problems,
before
powering
up
the
show.
K.
Be
sure
the
Controller
and
Compressor
room
doors
are
locked.
(Please
Double
Check
the
Doors)
(Note:
Security
policy
may
prohibit
leaving
the
building
during
night
hours.
Use
the
indoor
shut
off,
and
do
the
required
steps
during
power
up
procedures.)
1-004