EasyManua.ls Logo

Cressi-sub ELLIPSE - Page 6

Cressi-sub ELLIPSE
67 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Regulators repair and maintenance
January 2008 Rev. ELL. OCTO /A Ed. B / 09 6
2nd stage ELLIPSE Black
Yearly maintenance
Cressi-Sub recommends complete regulator maintenance at least once a year,
or more frequently in the case of particularly intense use.
Maintenance must include replacement of all components provided in the
annual equipment maintenance kit.
The special tools for maintenance of this equipment are illustrated in a section
of this document on page 8.
Metal parts must be washed with hot water and neutral detergent and rinsed
in fresh water. Any concretions must be removed using ultrasound cleaning or
with diluted acid solutions, always followed by long and thorough rinsing
under running water.
Do not use acids or solvents on rubber components.
The new ORs must be greased with a thin layer of silicon grease: this
procedure reduces to a minimum the risk of damage during assembly.
The metal threading can be lubricated with grease on the first two rings of
threading.

Related product manuals