EasyManua.ls Logo

CSZ Z-Plus - Page 11

Default Icon
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 11-C
6.6.2.6. Step 5 Soak at -40°C for 1 Hr. Repeat cycle for a total of 5 cycles
6.6.2.7. Step 6 Ramp to 25°C
6.6.2.8. Step 7 Soak at 24°C for 30 min
Jump set to 2: to repeat
the cycle until cycle count
is reached
Time set to 1 Hr.
Cycle count set to 1
minus the desired cycle
count: 5-1=4
Temp set to 24°C
CAUTION:
It is recommended to return
chamber to ambient temp
(24°C) after testing for at least
30 min to reduce any risk
when opening chamber door
Time set to 30 min.