Do you have a question about the CUBEX MARK II Series and is the answer not in the manual?
Read instructions completely before installation; use safety harness and hard hats.
Steps for beginning antenna assembly, laying out castings, and attaching spreader arms.
Warning about pre-spread spiders and potential breakage if forced past predefined limits.
Reminder to use climbing belt or safety harness when working on a tower for safety.
Caution regarding potential breakage of assembly parts if dropped or impacted against objects.
Discusses feed-point impedance, matching transformer, and feed line options for the quad antenna.
Provides an overview of band dimensions for Reflector and Driven Element wires in the quad loop.
Advises on truss guying for booms longer than 8 feet, especially for 2" material, for stability.
Caution on preventing wire unraveling and handling hot solder during wire preparation.
Procedure for applying wire wrap to element arm attachment points for stability and alignment.
Describes connecting reflector/director elements using splice or crimp sleeve method.
Describes an alternate method for connecting element wires using a line splice.
Additional notes on feeding methods, SWR, and Baluns for the antenna system.
Provides dimensions for the 2 element quad antenna, per side.
Details arm drilling dimensions for both Reflector and Driven Element sides of the quad.
Loading...