EasyManua.ls Logo

Curtis ThermoPro G3 Series - Page 9

Curtis ThermoPro G3 Series
43 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION INSTRUCTIONS II11
(5)&3.0130.*-"/0*/45"--"5*0/*/4536$5*0/4ø 092519E
Powering up the Unit (cont.)
16 8IFOUIFXBUFSMFWFMJOUIFUBOLSJTFTUPUIFDPSSFDU
volume, the heating elements will turn on automatically.
Depending on the incoming water temperature and
UIFFMFDUSJDBMTQFDJmDBUJPOTUIFXBUFSUBOLUZQJDBMMZ
requires 20 to 30 minutes to reach the factory set
PQFSBUJOHUFNQFSBUVSF8IFOUIFXBUFSIBTIFBUFE
“Ready to Brew” should be on the display.
17 #FGPSFCSFXJOHGPSUIFmSTUUJNFEJTQFOTFP[
ml of hot water through the hot water faucet to help
purge air from the tubing inside the brewer.
18 Brew a cycle of at least 12 oz./350 ml, to purge any
remaining air from the tubing. See OPERATING
INSTRUCTIONS. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIF
TPVOETPGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOE
water tank.
IMPORTANT: 8IFOPQFSBUJOHUIFVOJUBUIJHIFS
elevations, reduce the default operating
temperature (200°F/92°C) by 2°F/1°C for each
1000 feet (300 m) of elevation above 4000 feet
(1200 m). See PROGRAMMING GUIDE.

Related product manuals