EasyManua.ls Logo

CUSHCRAFT LFA-2M12EL - Page 6

CUSHCRAFT LFA-2M12EL
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Put one hose clamp over each end of each tube. Insert the loop ends into the 7/16 tubes.
Don’t force them. Keep them straight as they go in. Leave them loose for tunning the
SWR later. The tubes will have enough friction to stay without the hose clamps being
tightened.
INSTAL THE ELEMENTS
Here is how the elements line up. Notice element R3 is
shorter. This is by design. Each element is marked with
a color band. These color bands follow resistor color
code numbers. A chart is provided and the element bands
are shown for each element. Install them on the boom in
the proper location using the half washer, saddle and
8-32 x 2 inch bolts nuts and lock washers. Because of
different size boom sections, some bolts need to be longer
to mount the element. These bolt lengths are listed on the
next page.
8-32 x 2
8-32 x 2-1/4
8-32 x 2-1/2
half washer
element saddle
R1
R2
R3
R4
R5
R6
R7
R8
R9
R10
R11

Related product manuals