EasyManua.ls Logo

Daikin FTXA20A - Page 83

Daikin FTXA20A
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 | Components
Service manual
83
FTXA20~50A(W)(S)(T) + FTXA20~50B(B)(S)(T) + RXA42+50A +
RXA20~35A(9) + RXA42+50B
Split Stylish R32
ESIE18-03D – 2021.05
Is the correct spare part for the indoor
unit power PCB installed?
Action
No Replace the indoor unit power PCB, see
"2.9.2Repair procedures"[484].
To check the wiring of the indoor unit power PCB
Prerequisite: First perform all earlier checks of the indoor unit main PCB, see
"2.9.1Checking procedures"[481].
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
1 Check that all wires are properly connected and that all connectors are fully
plugged‑in.
2 Check that no connectors or wires are damaged.
3 Check that the wiring corresponds with the wiring diagram, see "5.2 Wiring
diagram"[4171].
INFORMATION
Correct the wiring as needed.
Is the problem solved? Action
Yes No further actions required.
No Return to "2.8.1Checking
procedures"[475] of the indoor unit
power PCB and continue with the next
procedure.
To check the fuse of the indoor unit main PCB
Prerequisite: First perform all earlier checks of the indoor unit main PCB, see
"2.9.1Checking procedures"[481].
1 Measure the continuity of the fuse. If no continuity is measured, the fuse has
blown.
a
a Fuse F1U
Blown fuse on the indoor unit power
PCB?
Action
Yes Replace the blown fuse, see
"2.9.2Repair procedures"[484].

Table of Contents

Related product manuals