10. WIRING EXAMPLE
10-1 HOW TO CONNECT WIRINGS
Wire only after removing the control box lid as shown in
Fig. 17, refering to view A or B depending on the type of unit.
CAUTION
When clamping the wiring, use the included clamp material
(9) and (10) as shown in the Fig.17 to prevent outside pres-
sure being exerted on the wiring connections and clamp
firmly.
Be sure to attach power supply wiring and earth wire to the
control box with the clamp.
When doing the wiring, make sure the wiring is neat and
does not cause the control box lid to stick up, then close the
cover firmly. When attaching the control box lid, make sure
you do not pinch any wires.
Outside the air conditioners, separate the weak wiring (remote
controller and transmission wiring) and strong wiring (earth
wire and power supply wiring) at least 50 mm so that they do
not pass through the same place together. Proximity may
cause electrical interference, malfunctions, and breakage.
[ PRECAUTIONS ]
Refer to the “REMOTE CONTROLLER INSTALLATION
MANUAL” on how to install and lay the wiring for the remote
controller.
See also the “Wiring Diagram plate” attached to the control
box lid when laying electrical wiring.
Connect the remote controller and transmission wiring their
respective terminal blocks.
CAUTION
Do not, under any circumstances, connect the power sup-
ply wiring to the remote controller or transmission wiring
terminal block. Doing so can destroy the entire system.
[ Connecting electrical wiring, remote controller wiring,
and transmission wiring ] (Refer to Fig. 18)
Power supply and Earth wiring
Remove the control box lid.
Next, pull the wires into the unit through the wiring through
hole and connect to the terminal block (3P).
Be sure to put the part of the sheathed vinyl into the control
box.
Remote controller and transmission wiring
Pull the wires into the unit through the wiring through hole
and connect to the terminal block (6P).
Be sure to put the part of the sheathed vinyl into the control
box.
Clamp
Clamp
Remove the clasp with screwdriver.
Let a wire go through the clasp, and
be sure to attach the clasp to the
control box.
Clamp
Match up the wiring sheath with the
fixing clasp with the clamping
material for preventing slippage on
the power supply side and clamp
(accessory (9)).
Clamp the wiring sheaths (accessory (10))
Clamp (for fixing in place)
Clamp (for prevent slippage)
Power supply wiring
Earth wire
Transmission wiring
Remote controller wiring
Do not connect power
supply wiring here.
That may cause
malfunctions.
(Rear)
Wiring Diagram
Control box lid
Power supply wiring
Earth wire
Penetration area
Make sure to let a wire go through a wire penetration area.
After wiring, seal the wire and wire penetration area to prevent
moisture and small creatures from the outside.
Wrap the strong and weak electric lines with the sealing
material (12) as shown in the figure below.
(Otherwise, moisture or small creatures such as insects from
the outside may cause short-circuit inside the control box.)
Attach securely so that there are no gaps.
Sealing
material (12)
(accessory)
Wire
[How to adhere it]
Outside
unit
Inside
unit
Fig. 17
view B
view A
Remote controller wiring
Transmission wiring
Power supply wiring
Earth wire
Clamp
Clamp
OFF
WIRING
FORCED
REMOTE
CONTRL
TRANS MISSION
Indoor PCboard (ASSY)
Terminal block (3P)
Terminal block (6P)
Wiring through hole
Wiring through hole
Power supply wiring
Earth wire
Remote controller wiring
Transmission wiring
P1
P2 F1F2 T1 T2
LN
OFF
WIRING
FORCED
REMOTE
CONTRL
TRANSMISSION
P
1
P
2
F
1
F
2
T
1
T
2
Fig. 18