EasyManua.ls Logo

Daikin FXFQ-P - Page 38

Daikin FXFQ-P
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EDUS391000-F1 Installation
FXFQ-P 37
3P161684-5H
English 23
Wiring Method (See ‘‘ELECTRIC WIRING WORK’’)
(3) Remove the control box lid
(4) Add remote control 2 (slave) to the terminal block for remote controller (P1, P2) in the control box.
(There is no polarity.) (Refer to Fig. 30 and 8-3.)
9-4 Computerised control (forced off and on/off operation)
(1) Wire specifications and how to perform wiring
Connect the input from outside to terminals T1 and T2 of the terminal block for remote controller.
(2) Actuation
The following table explains FORCED OFF and ON/OFF OPERATIONS in response to Input A.
(3) How to select FORCED OFF and ON/OFF OPERATION
Turn the power on and then use the remote controller to select operation.
9-5 Centralized control
For centralized control, it is necessary to designate the group No. For details, refer to the manual of each
optional controllers for centralized control.
Wire specificationCONDUCTORSTRANDEDNONSHIELDEDCOPPERCABLE06#ORVINYLJACKET
Gauge AWG18
Length Max. ft.
External terminal Contact that can ensure the minimum applicable load of 15 V DC, 1 mA.
FORCED OFF ON/OFF OPERATION
Input “ON” stops operation (impossible by remote controllers.) Input OFF ON turns ON unit.
Input OFF enables control by remote controller. Input ON OFF turns OFF unit.
S
M
S
S
M
Remote
controller
PC board
(Factory setting)
Fig. 33
Only one remote controller needs
to be changed if factory settings
have remained untoUched.
F2 T1 T2
FORCED
OFF
Input A

Related product manuals