Installation manual
R32 Split system air conditioners
English
Installation manual
R32 Split system air conditioners
RXA20A5V1B9
RXA25A5V1B9
RXA35A5V1B9
RXM20R5V1B9
RXM25R5V1B9
RXM35R5V1B9
ARXM25R5V1B9
ARXM35R5V1B9
Question and Answer IconNeed help?

Do you have a question about the Daikin RXM25R5V1B9 and is the answer not in the manual?

Daikin RXM25R5V1B9 Specifications

General IconGeneral
Cooling Capacity2.5 kW
Heating Capacity3.2 kW
Weight (Indoor Unit)8.5 kg
Indoor Unit Weight8.5 kg
TypeSplit System
RefrigerantR32
Indoor Noise Level19 dB(A)
Power Supply220-240 V, 50 Hz
Noise Level (Indoor Unit)19 dB(A)

Summary

Installer Safety Instructions

Outdoor Unit Installation

Preparing the Installation Site

Covers requirements for selecting and preparing the installation site for the unit.

Mounting the Outdoor Unit

Providing the Installation Structure

Explains how to prepare the installation structure using anchor bolts.

Installing the Outdoor Unit

Guides the installation of the outdoor unit onto its prepared structure.

Refrigerant Piping Installation

Connecting Refrigerant Piping

Connecting Piping to Outdoor Unit

Details the steps for connecting liquid and gas refrigerant piping.

Checking Refrigerant Piping

Checking for Leaks

Describes the procedure for checking refrigerant piping for leaks using a bubble test.

Performing Vacuum Drying

Outlines the steps for vacuum drying the refrigerant system.

Refrigerant Charging

Electrical Installation

Charging Additional Refrigerant

Guides the process of charging additional refrigerant into the system.

Finishing the Outdoor Unit Installation

Connecting Electrical Wiring to the Outdoor Unit

Details the process of connecting electrical wiring to the outdoor unit.

Commissioning

Checklist Before Commissioning

A checklist of items to verify after installation and before commissioning.

Performing a Test Run

Details the procedure for conducting a test run in cooling or heating mode.

Troubleshooting

Fault Diagnosis Using LED on Outdoor Unit PCB

Explains how to diagnose faults using the LEDs on the outdoor unit PCB.