EasyManua.ls Logo

Daikin RYYQ16U7Y1B - User Manual

Daikin RYYQ16U7Y1B
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Installation and operation manual
VRV IV+ heat pump
English
Installation and operation manual
VRV IV+ heat pump
RYYQ8U7Y1B*
RYYQ10U7Y1B*
RYYQ12U7Y1B*
RYYQ14U7Y1B*
RYYQ16U7Y1B*
RYYQ18U7Y1B*
RYYQ20U7Y1B*
RYMQ8U7Y1B*
RYMQ10U7Y1B*
RYMQ12U7Y1B*
RYMQ14U7Y1B*
RYMQ16U7Y1B*
RYMQ18U7Y1B*
RYMQ20U7Y1B*
RXYQ8U7Y1B*
RXYQ10U7Y1B*
RXYQ12U7Y1B*
RXYQ14U7Y1B*
RXYQ16U7Y1B*
RXYQ18U7Y1B*
RXYQ20U7Y1B*

Other manuals for Daikin RYYQ16U7Y1B

Questions and Answers

Summary

Specific installer safety instructions

Safety Precautions for Installers

Essential safety guidelines and warnings for installation personnel.

User safety instructions

General Safety Instructions

General safety warnings and user responsibilities.

3.1 General

General safety warnings and user responsibilities.

3.2 Instructions for safe operation

Specific operational safety guidelines to prevent hazards.

User interface

Operation

Maintenance and service

Troubleshooting

8.1 Error codes: Overview

Guide to interpreting error codes displayed by the system for troubleshooting.

19.1 Solving problems based on error codes

Guide to correcting malfunctions by identifying and resolving error codes.

19.2 Error codes: Overview

A table listing main and sub error codes, their causes, and solutions.

Unit installation

Piping installation

14.1 Preparing refrigerant piping

Requirements and guidelines for preparing and installing refrigerant piping.

14.2.2 To connect the refrigerant piping to the outdoor unit

Procedure for connecting refrigerant piping to the outdoor unit, including precautions.

14.3.4 To perform a leak test

Detailed instructions for performing both vacuum leak tests and pressure leak tests.

14.4.4 To charge refrigerant: Flow chart

Flow chart illustrating the refrigerant charging process, including pre-charging and final charging steps.

14.4.6 Step 6 a: To automatically charge refrigerant

Detailed steps for performing automatic refrigerant charging, including conditions and error handling.

14.4.7 Step 6 b: To manually charge refrigerant

Detailed steps for performing manual refrigerant charging, including conditions and error handling.

14.1.1 Refrigerant piping requirements

Essential requirements for refrigerant piping, including material, cleanliness, and temper grade.

14.3.5 To perform vacuum drying

Step-by-step guide for removing moisture from the system via vacuum drying.

14.4.5 To charge refrigerant

Step-by-step guide to charging refrigerant, covering pre-charging and final charging procedures.

14.4.8 Error codes when charging refrigerant

List and explanation of error codes that may occur during refrigerant charging operations.

14.2 Connecting Refrigerant Piping

Detailed steps for connecting refrigerant piping, including routing, branch kits, and stop valves.

Checking the refrigerant piping

14.3.1 About checking the refrigerant piping

Overview of the refrigerant piping check process, including leak testing and vacuum drying.

Charging refrigerant

14.4.1 Precautions when charging refrigerant

Essential safety precautions and warnings to be followed when charging refrigerant.

14.4.2 About charging refrigerant

Overview of the two methods for charging additional refrigerant: automatic and manual.

14.4.3 To determine the additional refrigerant amount

Formula and tables for calculating the required additional refrigerant amount.

Electrical installation

15.2 Safety device requirements

Requirements for power supply protection devices like main switches, fuses, and earth leakage protectors.

Configuration

16.1 Making field settings

Overview of making field settings for the VRV IV heat pump system.

16.1.1 About making field settings

Explanation of how to input data into the unit's PCB using push buttons and DIP switches.

Commissioning

16.2 Using the leak detection function

Explanation and activation of the automatic leak detection function.

17.3 About the test run

Information about the test run procedure, its purpose, and parameters.

17.1 Precautions when commissioning

Important safety precautions to observe before and during system commissioning.

17.4 To perform a test run

Step-by-step guide for performing the system test run to verify operation and settings.

17.2 Checklist before commissioning

A checklist of essential items to verify after installation and before unit power-up.

Hand-over to the user

Technical data

Summary

Specific installer safety instructions

Safety Precautions for Installers

Essential safety guidelines and warnings for installation personnel.

User safety instructions

General Safety Instructions

General safety warnings and user responsibilities.

3.1 General

General safety warnings and user responsibilities.

3.2 Instructions for safe operation

Specific operational safety guidelines to prevent hazards.

User interface

Operation

Maintenance and service

Troubleshooting

8.1 Error codes: Overview

Guide to interpreting error codes displayed by the system for troubleshooting.

19.1 Solving problems based on error codes

Guide to correcting malfunctions by identifying and resolving error codes.

19.2 Error codes: Overview

A table listing main and sub error codes, their causes, and solutions.

Unit installation

Piping installation

14.1 Preparing refrigerant piping

Requirements and guidelines for preparing and installing refrigerant piping.

14.2.2 To connect the refrigerant piping to the outdoor unit

Procedure for connecting refrigerant piping to the outdoor unit, including precautions.

14.3.4 To perform a leak test

Detailed instructions for performing both vacuum leak tests and pressure leak tests.

14.4.4 To charge refrigerant: Flow chart

Flow chart illustrating the refrigerant charging process, including pre-charging and final charging steps.

14.4.6 Step 6 a: To automatically charge refrigerant

Detailed steps for performing automatic refrigerant charging, including conditions and error handling.

14.4.7 Step 6 b: To manually charge refrigerant

Detailed steps for performing manual refrigerant charging, including conditions and error handling.

14.1.1 Refrigerant piping requirements

Essential requirements for refrigerant piping, including material, cleanliness, and temper grade.

14.3.5 To perform vacuum drying

Step-by-step guide for removing moisture from the system via vacuum drying.

14.4.5 To charge refrigerant

Step-by-step guide to charging refrigerant, covering pre-charging and final charging procedures.

14.4.8 Error codes when charging refrigerant

List and explanation of error codes that may occur during refrigerant charging operations.

14.2 Connecting Refrigerant Piping

Detailed steps for connecting refrigerant piping, including routing, branch kits, and stop valves.

Checking the refrigerant piping

14.3.1 About checking the refrigerant piping

Overview of the refrigerant piping check process, including leak testing and vacuum drying.

Charging refrigerant

14.4.1 Precautions when charging refrigerant

Essential safety precautions and warnings to be followed when charging refrigerant.

14.4.2 About charging refrigerant

Overview of the two methods for charging additional refrigerant: automatic and manual.

14.4.3 To determine the additional refrigerant amount

Formula and tables for calculating the required additional refrigerant amount.

Electrical installation

15.2 Safety device requirements

Requirements for power supply protection devices like main switches, fuses, and earth leakage protectors.

Configuration

16.1 Making field settings

Overview of making field settings for the VRV IV heat pump system.

16.1.1 About making field settings

Explanation of how to input data into the unit's PCB using push buttons and DIP switches.

Commissioning

16.2 Using the leak detection function

Explanation and activation of the automatic leak detection function.

17.3 About the test run

Information about the test run procedure, its purpose, and parameters.

17.1 Precautions when commissioning

Important safety precautions to observe before and during system commissioning.

17.4 To perform a test run

Step-by-step guide for performing the system test run to verify operation and settings.

17.2 Checklist before commissioning

A checklist of essential items to verify after installation and before unit power-up.

Hand-over to the user

Technical data

Daikin RYYQ16U7Y1B Specifications

General IconGeneral
ModelRYYQ16U7Y1B
SeriesVRV IV
CategoryHeat Pump
RefrigerantR410A
Energy Efficiency Ratio (EER)3.5
Coefficient of Performance (COP)4.0
Power Source380-415V / 50Hz / 3 Phase
Dimensions (Outdoor Unit)1, 680 x 930 x 765 mm

Related product manuals