EasyManua.ls Logo

Daikin VRV III RQQ8-48PY1 - Page 146

Daikin VRV III RQQ8-48PY1
156 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Penyelesaian Masalah Menggunakan Remote Kontrol
Si341213
Diagnosis Servis
136
CHECK 4
Power Transistor Check
Perform the following procedures prior to check.
(1)
Power OFF.
(2)
Remove all the wiring connected to the PCB where power transistors are mounted on.
[Preparation]
·
Tester
Preparing a tester in the analog system is recommended.
A tester in the digital system with diode check function will
be usable.
[Point of Measurement and Judgement Criteria]
·
Measure the resistance value using a tester at each point of measurement below, after 10 minutes power OFF.
To use analog tester:
Measurement in the resistance value mode in the range of
multiplying 1k.
To use digital tester:
Measurement is executed in the diode check mode. (
)
[PCB and Circuit Diagram]
No.
Point of Measurement
Judgement Criteria
Remarks
+
1
P2
U
1.2V and over
Due to condenser charge
and so on, resistance
measurement may require
some time.
2
P2
V
3
P2
W
4
U
P2
0.3 ~ 0.7V
5
V
P2
6
W
P2
7
N3
U
8
N3
V
9
N3
W
10
U
N3
1.2V and over
Due to condenser charge
and so on, resistance
measurement may require
some time.
11
V
N3
12
W
N3
No.
Point of Measurement
Judgement Criteria
Remarks
+
1
P2
U
2 ~ 15k
2
P2
V
3
P2
W
4
U
P2
15k and
above
(including )
Due to condenser charge
and so on, resistance
measurement may require
some time.
5
V
P2
6
W
P2
7
N3
U
8
N3
V
9
N3
W
10
U
N3
2 ~ 15k
11
V
N3
12
W
N3
U V
W
L1A L2A L3A
N3
P2
P1
N3

Table of Contents

Related product manuals