Do you have a question about the Daikin ZUW.C-B and is the answer not in the manual?
Guidelines for safe chiller installation, including qualified personnel and proper foundation.
Essential safety measures for operating the chiller, covering abnormal conditions and electrical hazards.
Safety guidelines for moving, repairing, or modifying the chiller.
Guidance on selecting an appropriate installation site and preparing a suitable foundation for the chiller.
Steps involved in dismantling and reassembling the chiller, including leakage tests and vacuum procedures.
Instructions for connecting water pipes, including anti-vibration, flow rate, and water quality considerations.
Essential checks of the power circuit, including insulation resistance and grounding, before initial power-up.
Verifying cable connections, interlocks, and terminal tightness for safe operation.
Confirming that the power supply voltage, frequency, and phase balance meet the chiller's requirements.
Verifying water filling, pressure, air removal, and flow adjustment in the water system.
Confirming the correct status of all valves on the chiller before starting operation.
Ensuring that the control panel settings match the customer's system requirements before start-up.