EasyManua.ls Logo

Daikin ZUW.C-B User Manual

Daikin ZUW.C-B
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Single Screw Chillers
This manual is applicable to following models and their derived and
modified models.
ZUWCM/DM ZUW.C-B ZUWY ZUWV ZUW-HCA
Thanks for purchasing DAIKIN chiller.
The Manual specifies safety, installation and maintenance precautions.
Please read through the manual before installation and use.
For future reference, please be sure to keep it safe.
Engineered for Flexibility and performance
IMM Chiller universal part
Category: Single Screw Chiller
Date: Mar. 2019
New Part No.: Z8100180-09
Prior Part No.: Z8100180-08
Engineering Data
(Installation, Maintenance Manual)

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Daikin ZUW.C-B and is the answer not in the manual?

Daikin ZUW.C-B Specifications

General IconGeneral
BrandDaikin
ModelZUW.C-B
CategoryChiller
LanguageEnglish

Summary

3. Working Principles

4. Safety Precautions

4.1 Precautions during Installation

Guidelines for safe chiller installation, including qualified personnel and proper foundation.

4.2 Precautions during Use

Essential safety measures for operating the chiller, covering abnormal conditions and electrical hazards.

4.3 Precautions during Relocation and Repair

Safety guidelines for moving, repairing, or modifying the chiller.

5. Chiller Transit and Lifting

6. Installation Procedures

6.1 Chiller location and foundation

Guidance on selecting an appropriate installation site and preparing a suitable foundation for the chiller.

6.2 Knockdown of Chiller

Steps involved in dismantling and reassembling the chiller, including leakage tests and vacuum procedures.

6.3 Piping of the chillers

Instructions for connecting water pipes, including anti-vibration, flow rate, and water quality considerations.

7. Pre-Test Run Checks

7.1 Inspect the power circuit

Essential checks of the power circuit, including insulation resistance and grounding, before initial power-up.

7.2 Acknowledgement of cables

Verifying cable connections, interlocks, and terminal tightness for safe operation.

7.3 Power supply check

Confirming that the power supply voltage, frequency, and phase balance meet the chiller's requirements.

7.4 Water system check

Verifying water filling, pressure, air removal, and flow adjustment in the water system.

7.5 Check chiller

Confirming the correct status of all valves on the chiller before starting operation.

7.6 Panel setting check

Ensuring that the control panel settings match the customer's system requirements before start-up.

8. Chiller Functions and Control

9. Maintenance Procedures

10. Long-time Stop Precautions

11. Operating Range and Environment

Related product manuals