Single Screw Chillers
This manual is applicable to following models and their derived and
modified models.
ZUWCM/DM ZUW.C-B ZUWY ZUWV ZUW-HCA
Thanks for purchasing DAIKIN chiller.
The Manual specifies safety, installation and maintenance precautions.
Please read through the manual before installation and use.
For future reference, please be sure to keep it safe.
Engineered for Flexibility and performance
IMM Chiller universal part
Category: Single Screw Chiller
Date: Mar. 2019
New Part No.: Z8100180-09
Prior Part No.: Z8100180-08
Engineering Data
(Installation, Maintenance Manual)

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Daikin ZUWV and is the answer not in the manual?

Daikin ZUWV Specifications

General IconGeneral
BrandDaikin
ModelZUWV
CategoryChiller
LanguageEnglish

Summary

Safety Matters

2. Major Component Locations

3. Working Principles

4. Safety (Please follow the following content strictly)

4.1 Precautions during Installation

Key safety precautions and requirements to be followed during chiller installation.

4.2 Precautions during Use

Essential safety measures and warnings for operating the chiller correctly.

4.3 Precautions during Relocation and Repair

Safety guidelines for moving and repairing the chiller unit.

4.4 Notes for Relief Valve

Specific notes and considerations regarding the relief valve system.

5. Chiller transit

6. Installation

6.1 Chiller location and foundation

Guidance on selecting an appropriate location and preparing the foundation for the chiller.

6.3 Piping of the chillers

Details on connecting water pipes, including anti-vibration and flow rate guidelines.

6.4 Electric Works

Instructions for electrical wiring, including confirmation and grounding.

7. Matters to be Confirmed before Test Run

7.1 Inspect the power circuit

Checks required for the power circuit before energizing the unit.

7.2 Acknowledgement of cables

Verification of cable connections and interlocks before powering up.

7.3 Power supply check

Ensuring the power supply meets the required voltage and frequency specifications.

7.4 Water system check

Procedures for checking the water system, including filling, pressure, and leakage.

9. Maintenance

9.3 Regular Maintenance

Scheduled maintenance tasks for regular upkeep of the chiller.

10. Precautions for Long-time Stop

Related product manuals