Questions and Answers:

Daikin Trailblazer AGZ110-130E Specifications

General IconGeneral
BrandDaikin
ModelTrailblazer AGZ110-130E
CategoryChiller
LanguageEnglish

Summary

Installation and Application Information

Electrical Data

Electrical Connection

Details electrical connection requirements, wiring, and safety precautions.

Unit Controller Operation

Set Points

Details the configurable set points for unit operation.

Sequence of Operation

Unit Sequence of Operation - Cool Mode

Describes the step-by-step process for chiller operation in cool mode.

Unit Sequence of Operation - Ice Mode

Explains the sequence of operation for the chiller in ice mode.

Circuit Sequence of Operation

Outlines the operational sequence for individual refrigerant circuits.

Unit Functions

Unit Capacity Control

Explains how the unit's capacity is managed and limited.

Compressor Staging in Cool Mode

Details how compressors are staged for optimal cooling performance.

Circuit Functions

Alarms

Evaporator Flow Loss

Describes the alarm triggered by a lack of evaporator flow.

Evaporator Water Freeze Protect

Explains the alarm for potential evaporator freezing.

Low Evaporator Pressure

Details the alarm for critically low evaporator pressure.

Using the Controller

Fan VFD Controller

Types of Alarms, Faults, and Errors

Categorizes and describes different types of drive alarms, faults, and errors.

Startup and Shutdown Procedures

Pre-Startup

Outlines essential checks before initiating chiller startup.

Pre-Startup Electrical Check Out

Details the critical electrical checks required before startup.

Startup

Provides instructions for the initial startup of the chiller.

Unit Maintenance

Troubleshooting Chart

Compressor Will Not Run

Addresses issues when the compressor fails to start.

Warranty Registration Form (Scroll)

Limited Product Warranty