7
®
Installation and Operating Instructions
CONTENTS
Page
1. INTRODUCTION 8
2. THE EQUIPMENT 8
2.1 The control unit 8
2.2 The cell 8
2.3 The connection cables 8
3. INSTALLATION 9
4. WATER ANALYSIS AND BALANCE 10
4.1 Dissolution of the salt 10
4.2 Stabiliser 10
4.3 pH 10
4.4 Total alkalinity 10
4.5 Insufficient salt 10
5. OPERATION 11
5.1 Control panel 11
5.2 Other indications 12
5.3 Chlorine production control 13
5.4 Low salinity indicators 13
5.5 Other factors likely to stop production 14
5.6 Spring mode 14
6. MAINTENANCE 14
6.1 Cleaning the cell 15
6.2 Salinity 15
6.3 Water balance 15
7. MALFUNCTIONS 15
8. GUARANTEE 16
9. APPENDIX 1 – INSTALLATION LAYOUT DIAGRAM 17