EasyManua.ls Logo

DAYLIFF DQA - Page 9

Default Icon
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
5. Place gaskets at the inlet and outlet when installing the pump, then tighten
connectors to prevent water leakage.
The location of terminal box can be adjusted accordingly to users’ request
To achieve this;
Ÿ Isolate power supply.
Ÿ Watch out for high water temperature.
Ÿ Close the valves at inlet and outlet to drain the fluid from the pipelines.
0
Ÿ Rotate the terminal box by 90 , fix the screws.