EasyManua.ls Logo

DELAVIN W101 - Preparation and Tools; Preparation Steps; Required Tools

DELAVIN W101
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
R
DELAVIN
TOOLS REQUIRED
OTHER TOOLS MAY BE REQUIRED
Level Caulk Gun Drill Hammer
M itter Saw
or Hacksaw
CaulkSoft Cloth
or Blanket
Safety Glass
Tape
M easure
Pencil
Phillips
Screwdriver
Drill Bit
(Ø=5/ 16")
Drill Bit
(Ø=3/ 8")
PREPARAT I ON
1
1. We strongly recommend that this product be installed by a licensed and insured professional contractor, including
the assistance of a second person during installation.
2. After opening all boxes and packages, please read this introduction carefully. Check that all required parts are
included in the package by marking all components on the Shower Door Components Detail Sheet. Inspect boxes
and packages for shipping damage. If the unit has been damaged, has a finishing defect or has missing parts,
please contact our customer support department within 3 business days of the delivery date. Please note that
DELAVIN will not replace any damaged products or missing parts free of charge after 3 business days or if the
product has been installed. Feel free to contact DELAVIN if you have any questions.
Attention: Please double check the glass corners and four edges of the two glass doors to ensure that all glass is in
perfect condition and without any breakage. Do not attempt to install a shower door if the glass corners are broken.
3. Please note that if you are in doubt about installation compliance standards, please consult your local building
codes. Building and plumbing codes may vary by location and DELAVIN is not responsible for your project's code
compliance standards and does not accept any returns.
4. Before installation, make sure the installation surface is leveled and solid, and can support the total weight of the
unit. Also, make sure the walls are at right angles. Irregular mounting surface levels or improper angle of side walls
will cause serious problems during installation. Note that some adjustments and drilling may be required during
installation.
5. Protect all major surfaces of the product during installation. Never place glasses directly on tile floors. Leave the
corner protector in place until it needs to be removed. Always use a piece of wood or cardboard to protect the
bottom edges and corners of the glass before and during installation.
R
DELAVIN
2
1
2
3
4
5
6
7
8
9
10
11
Bumper Strip
Guide Rail Bracket
Glass Door Stopper
Roller
Handle
Glass Door
Anti-splash Threshold
1 pc
2 pcs
1 pc
1 pc1 set
12
13
14
2 pcs
3 pcs
2 pcs
1 pc
2 pcs
1 pc
1 pc
1 pc
2 pcs
1 pcs
1 pc
7 pcs
16
17
18
20
15
19
No. Description
QTY
No. Description
QTY
1 pc
2
22
1
Side Anti-Water Strip
1 pc
Upper Guide Rail
A
Measuring tool
llen Key
1
2
3
4
5
6
7
8
9
14
20
19
16
17
15
13
18
21
12
23
2 pcs
Glass Door
Stationary Glass
10
2 pcs
2 pcs
11
Screw M4X25
Aluminum Cover(optional)
Screw M4X30
Screw M4.8X32
Guide Block
Wall Anchor
L Wall Cover
Stationary Glass
Screw M5X40
Glass Bracket
Safety Pin
TEAR OFF THE GLASS PROTECTIVE FILM BEFORE INSTALLATION
Measuring tool
(No installation
required):
Only used for
marking hole
positions, please
place this piece
of aluminum on
the ground
against the wall,
and mark on the
wall according to
the holes in the
aluminum,then
you can make
the hole.