Doc. Nr.: DSDL_23016_A
[10]
C. MILK FROTHING PREPARATION
Milk frothing preparation steps:
- Thermoblock is activated (setting temperature higher than 100°C)
- EV1 solenoid valve is activated
- Pump is activated in slow pulsing mode for a certain timing
- The steam is delivered to the milk jug attached to the accessory nozzle. Here it mixes with milk and
air to produce hot frothed milk.
- Pump stops, EV1 and Thermoblock are deactivated.
Milk jug cleaning procedure:
- Thermoblock is activated
- EV1 solenoid valve is activated
- Pump is activated in very slow pulsing mode
- Hot water is delivered through the milk jug lid to clean its internal circuit
- Pump stops, EV1 and Thermoblock are deactivated.