INSTALLATION
Continued
13"
16"
19"
21"
2
1
/2"
6"
8"
10"
Minimum Non-
Combustible
Material
Figure 16 - Minimum Mantel Clearances
for Built-In Installation
Mantel Shelf
Note:
All Vertical
measurements
are from top of
fireplace opening
to bottom of
mantel shelf.
Mantel Clearances for Built-In
Installation
If placing mantel above built-in fireplace, you must
meet minimum clearance between mantel shelf and
top of fireplace opening.
NOTICE: If your installation does
not meet the minimum clear-
ances shown, you must do one
of the following:
raise the mantel to an accept-
able height
remove the mantel
NOTICE: Surface temperatures
of adjacent walls and mantels
become hot during operation.
Walls and mantels above the
firebox may become hot to
the touch. If installed properly,
these temperatures meet the
requirement of the national
product standard. Follow all
minimum clearances shown in
this manual.
INSTALLING GAS PIPING TO
FIREPLACE LOCATION
WARNING: This appliance
requires a 1/2" NPT (National
Pipe Thread) inlet connection to
the pressure regulator.
WARNING: A qualified
service person must connect
fireplace to gas supply. Follow
all local codes.
CAUTION: Never connect pro-
pane/LP fireplace directly to the
propane/LP supply. This fireplace
requires an external regulator
(not supplied). Install the external
regulator between the replace
and propane/LP supply.
WARNING: Never connect
natural gas replace to private
(non-utility) gas wells. This
gas is commonly known as
wellhead gas.
Installation Items Needed
Before installing fireplace, make sure you have
the items listed below.
external regulator for propane/LP unit only
(supplied by installer)
piping (check local codes)
sealant (resistant to propane/LP gas)
equipment shutoff valve *
test gauge connection *
sediment trap (optional)
tee joint
pipe wrench
approved flexible gas line with gas connector
(if allowed by local codes) (not provided)
* A CSA design-certified equipment shutoff valve
with 1/8" NPT tap is an acceptable alternative to
test gauge connection. Purchase the optional CSA
design-certified equipment shutoff valve from your
dealer. See
Accessories, page 32.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Desa EFS33PRB and is the answer not in the manual?

Desa EFS33PRB Specifications

General IconGeneral
BrandDesa
ModelEFS33PRB
CategoryIndoor Fireplace
LanguageEnglish

Related product manuals