EasyManua.ls Logo

DETAIL K2 MMT5X7G User Manual

DETAIL K2 MMT5X7G
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
MMT5X7G man v.171214
DETAIL K2 INC.
1080 Clay Ave., Unit #2
Burlington Ont. L7L 0A1
1-888-277-6960
Trailer Assembly Guide
Model MMT5X7G
2050 GVWR All Steel Trailer
7.5 ft. (229 cm)
Utility
Trailer
GALVANIZED
Question and Answer IconNeed help?

Do you have a question about the DETAIL K2 MMT5X7G and is the answer not in the manual?

DETAIL K2 MMT5X7G Specifications

General IconGeneral
BrandDETAIL K2
ModelMMT5X7G
CategoryUtility Vehicle
LanguageEnglish

Summary

STEP 1

STEP 2

STEP 3

STEP 4

STEP 5

STEP 6

Pre-Wiring

Connects the wire harness for trailer lights and connections.

STEP 7

Install Fenders

Attaches fenders to the trailer axle, cautioning about trailer weight.

STEP 8

Install Side Panels

Secures side panels using M8 bolts and lock nuts.

STEP 9

Install Lights

Mounts light assemblies and marker lights, completing wiring connections.

STEP 10

Install Gates

Installs gates using M10 bolts and lock nuts, advising against overtightening.

FINAL STEPS

IMPORTANT SAFETY CHECK LIST

LIGHTING & WIRING MAINTENANCE

LOADING YOUR TRAILER

Guidance on distributing weight, centering loads, and securing cargo.

TRAILER CAPACITY

Information on maximum payload, GVWR, and load placement.

TRAILER COUPLER

WHEEL BEARING & HUB ASSEMBLY

Re-packing Wheel Bearings

TRAILER LICENSING

PARTS LIST

SCHEMATIC DRAWING

Related product manuals