Core
Bore
Drilling
Machine
333 Prospect
St.
,
Elyria, Ohio
44035
(216) 323-4616
•
Fax:
(216)
323-8689
Customer Service:
1-800-321-5336
Customer Service Fax:
1-800-634-4035
Core
Bore
Drilling
Machine
Figure 2. Vacuum Motor and
Base
.
Vacuum Anchor Method-to-Floor
Warning: DO NOT use the Vacuum Anchor Method-
to-Wall.
The Vacuum Anchor Method
i
s recommended for
8-inch diameter holes or less. The Anchor Vacuum Method is NOT recommended on rough
or cracked floor condition
s
,
holes deeper than one bit
length
,
steel concentrat
i
o
n
greater than
standard rebar
1.
Turn Machine on its back and insert Vacuum Seal (Fig. 3) under Machine Base,inspecting
first to ensure Seal is in good
condit
i
on
and sealing groove is
c
le
an
.
2. Turn Drilling Machine up-right and loosen 4 Base
Leveling Screws
.
3. Plug Service Cord into a properly grounded recep tacle and turn Vacuum Pump ON/OFF
Switch to the ON
position.
4
.
Insert Vacuum Slot Cap into Anchor Bolt Slot (Fig
2) and check vacuum and hose connections. Vacuum Gauge
(Fig.
2) must read a
minimum of
20 inches of
mercury
.
5. The Drilling Machine should now be vacuum anchored
.
If Machine does not anchor
,
add weight
by
standing on Vacuum Base. It should now an chor withVacuum Gauge reading
20
inches
of mer-
cury
min1mu m.
I
f
not,
check the floor and Vacuum
Seal (Fig. 3) for leaks
.
6 Adjust 4 Leveling Screws to eliminate rocking and to stabilize Machine and plumb
Mast
.
The
Machine is now ready to
dri
ll
.
1