DINO 260XTD
5
17.3 WHEEL BRAKES AND BEARINGS......................................................................................42
17.4 LUBRICATION
PLAN............................................................................................................45
17.5 LONG-TERM
STORAGE........................................................................................................46
17.6 LOAD HOLDING AND LOAD REGULATION VALVES....................................................47
17.7 LEVELLING SYSTEM OF THE PLATFORM.......................................................................49
17.8 REGULAR SERVICING .........................................................................................................50
17.8.1 TESTING THE OUTREACH LIMIT SWITCH...................................................................55
17.8.2 SETTING OF THE OUTREACH LIMIT SWITCH AND THE OVERLOAD LIMIT
SWITCH 57
18 INSPECTION INSTRUCTIONS.................................................................................................61
18.1 FIRST INSPECTION ...............................................................................................................61
18.2 SAMPLE
OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM........................62
18.3 DAILY
INSPECTION (START-UP INSPECTION)...............................................................64
18.4 MONTHLY INSPECTION (MAINTENANCE INSPECTION) .............................................65
18.5 ANNUAL INSPECTION (REGULAR INSPECTION)...........................................................66
18.6 EXTRAORDINARY INSPECTION........................................................................................69
18.7 TEST LOADING INSTRUCTIONS FOR REGULAR INSPECTION....................................70
19 FAULT FINDING.........................................................................................................................71
20 OPERATION OF ELECTRIC COMPONENTS.......................................................................77
20.1 MAIN CENTRE (PK), RELAYS .............................................................................................77
20.2 MAIN CENTRE (LCB), SWITCHES ...............................................................................................78
20.3 MAIN CENTRE (LCB), OTHER ITEMS ..........................................................................................79
20.4 CONTROL CENTRE (UCB), RELAYS............................................................................................80
20.5 CONTROL CENTRE (UCB), SWITCHES ........................................................................................80
20.6 CONTROL CENTRE (UCB), OTHER ITEMS ...................................................................................81
20.7 CONTROL CENTRE ON CHASSIS (CCB), SWITCHES (EMERGENCY DESCENT OPERATIONS)...........81
20.8 CONTROL CENTRE ON CHASSIS (CCB), OTHER ITEMS ................................................................81
20.9 CHASSIS, OTHER ITEMS ..............................................................................................................82
20.10 LIMIT SWITCHES ........................................................................................................................82
20.11 TURNING DEVICE (RU), OTHER ITEMS........................................................................................83
21 ELECTRIC DIAGRAM 26323 >.................................................................................................84
22 HYDRAULIC COMPONENTS.................................................................................................103
23 HYDRAULIC DIAGRAM .........................................................................................................
104