EasyManua.ls Logo

Dionex ICS-6000 - Page 31

Default Icon
31 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 System Setup
Doc. 22181-97001 02/18
95
5. Select Local Machine, and then click Next.
6. Click Place all certificates in the following store, browse to locate
“Trusted Root Certification Authorities,” and click Next.
7. Click Finish.
8. In the Certificate dialog box, click Install Certificate.
g. When the “The import was successful.” message is displayed, click
OK.
3.13 Connecting Drain Lines
Any leaks or condensation that may occur are routed to the drain port on the
rear of each module.
Connecting Drain Hoses to the DP/SP and EG
1. Locate the corrugated drain hose (P/N 055075) in the Ship Kit for each
module.
2. Push the hose onto the drain port on the rear of each module.
3. Place the open end of each hose into a waste container or appropriate
drain. Verify that the line lays flat on the bench (this ensures that liquid
drains over the edge of the bench).
NOTE
To remove a corrugated drain hose from a drain port,
grasp the hose at the area over the port where the hose
is solid (not corrugated) and pull the hose straight off.
For correct drainage, make sure drain hoses lay flat on the bench and
are not bent, pinched, or elevated at any point. Do not allow the ends of
the drain hoses to be submerged in waste liquid.