50 1030/1230 - LUBRICATION AND MAINTENANCE
LUBRICATION SCHEDULE
50 1030/1230 - LUBRICATION AND MAINTENANCE
LUBRICATION SCHEDULE
Engine Oil
Check
Check engine oil at dipstick (A)
before each operation. Add GEO
at fill neck (A) as necessary to
keep oil level at highest line on
dipstick.
Change
Change oil every 100 hours
with GEO.
Drain crankcase (B) while oil is
still warm.
Refill at fill neck with 2.3 pt
(1.1 L) of GEO.
Engine Oil
Check
Check engine oil at dipstick (A)
before each operation. Add GEO
at fill neck (A) as necessary to
keep oil level at highest line on
dipstick.
Change
Change oil every 100 hours
with GEO.
Drain crankcase (B) while oil is
still warm.
Refill at fill neck with 2.3 pt
(1.1 L) of GEO.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ditch Witch 1230 and is the answer not in the manual?

Ditch Witch 1230 Specifications

General IconGeneral
BrandDitch Witch
Model1230
CategoryFarm Equipment
LanguageEnglish

Related product manuals