EasyManua.ls Logo

Ditch Witch 1230 - Engine Oil

Ditch Witch 1230
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50 1030/1230 - LUBRICATION AND MAINTENANCE
LUBRICATION SCHEDULE
50 1030/1230 - LUBRICATION AND MAINTENANCE
LUBRICATION SCHEDULE
Engine Oil
Check
Check engine oil at dipstick (A)
before each operation. Add GEO
at fill neck (A) as necessary to
keep oil level at highest line on
dipstick.
Change
Change oil every 100 hours
with GEO.
Drain crankcase (B) while oil is
still warm.
Refill at fill neck with 2.3 pt
(1.1 L) of GEO.
Engine Oil
Check
Check engine oil at dipstick (A)
before each operation. Add GEO
at fill neck (A) as necessary to
keep oil level at highest line on
dipstick.
Change
Change oil every 100 hours
with GEO.
Drain crankcase (B) while oil is
still warm.
Refill at fill neck with 2.3 pt
(1.1 L) of GEO.

Related product manuals