EasyManua.ls Logo

Doufit TR-06 - Step 3: Assemble the jumping mat; Step 4: Assemble the spring pad

Default Icon
9 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 4
Step 3: Assemble the jumping mat
Attention: Two hooks of the spring(No.5) are different.
The more curved hook should be attached to the jumping
mat(No.4), while another side should be attached to the
frame.
You need to attach the springs by using the spring hook as
follows, or it will be difficult to finish.
Firstly, attach a spring every 10 holes.
Secondly, attach a spring every 5 holes.
Thirdly, attach a spring every 2 holes.
Finally, attach the remaining springs to the remaining
holes.
Step 4: Assemble the spring pad
Cover the spring pad(No.6) on the springs. And then tie
the rope under the mat.
1
2
3
4
5
1
6
7
8
9
10
2
3
4
5
6