EasyManua.ls Logo

Dover ProGauge MagLink LX 4 - Automatic LLD Leak Test Setup

Dover ProGauge MagLink LX 4
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
process from the forecourt (the technician lifts the nozzle for 2 seconds and puts the nozzle back in
the cradle. The calibration will then start).
13. Calibration status: This is an information window that shows the current status of the process.
14. START button: This starts the calibration sequence (this can be immediately or through the nozzle
signal . Refer to “Start calibration immediately" in the previous step.).
15. STOP button: This will stop the calibaration sequence.
Click the SAVE button to save the current pipeline setup.
NOTE: If the DELETE button is selected, it will erase the PLLD configuration.
Leak Test
Automatic LLD leak test click the Save button to save the settings
1. Enabled: When this button is “Enabled,” the system will run a leak test automatically that uses
specified frequencies.
M2051_r4 MagLink LX 4 and LX Plus Configuration Manual | Dover Fueling Solutions 88

Other manuals for Dover ProGauge MagLink LX 4