Do you have a question about the Dukane 24A715M and is the answer not in the manual?
Details the methods and considerations for physically installing the master clock unit.
Covers the essential steps for connecting power sources, secondary clocks, and signaling devices to the master clock.
Guides users through the initial programming steps required to get the master clock operational.
Explains how to access programming functions using administrative and user passwords.
Details the procedure for correctly setting the master clock's date and time.
Illustrates correct wiring for 120Vac and 220/240Vac operation, including jumper settings.
Diagram of the master clock's power supply circuit board components and connections.