EasyManua.ls Logo

Dynapac PL 1000 RS - Angular Gear

Dynapac PL 1000 RS
230 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
F 36
F_PL1000RS_GB.fm 36-76 - 04.07
Angular gear
Oil level check
$
Check oil level every 50 operating hours.
When checking the oil level or topping
the oil up, the machine must be standing
on level ground.
- Unscrew and remove the filler and in-
spection screw (1).
The oil level should reach the lower edge
of the bore for the screw plug.
- Top up oil through the open bore until
a little oil starts to emerge.
- Reinstall filler and inspection screw
properly.
$
When filling with oil, ensure high standards of cleanliness are observed.
Gear1000.wmf
1

Table of Contents