EasyManua.ls Logo

Dynisco SPX2 Series - Page 2

Dynisco SPX2 Series
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
COMMISSIONING
DD
DD
D
YNISCYNISC
YNISCYNISC
YNISC
OO
OO
O
SS
SS
S
PXPX
PXPX
PX
SS
SS
S
ERIEERIE
ERIEERIE
ERIE
SS
SS
S
Q Q
Q Q
Q
UICKUICK
UICKUICK
UICK
SS
SS
S
TT
TT
T
ARAR
ARAR
AR
TT
TT
T
C C
C C
C
ARDARD
ARDARD
ARD
This Quick Start Setup guide can be used by experienced instrumentation technicians to configure the
Transmitter using the Zero and Span push-buttons or via the optional Hart Communications. For more
detailed information please consult the complete manual before operating. The Quick Start procedure
with Hart is designed for users already familiar with the use of the Hart Communicator and loop powered
instrumentation.
QQ
QQ
Q
UICKUICK
UICKUICK
UICK
SS
SS
S
TT
TT
T
ARAR
ARAR
AR
TT
TT
T
U U
U U
U
TILIZINGTILIZING
TILIZINGTILIZING
TILIZING
P P
P P
P
USHUSH
USHUSH
USH
B B
B B
B
UTUT
UTUT
UT
TT
TT
T
ONSONS
ONSONS
ONS
1. Insure the mounting hole is clear of any frozen polymer or debris and is machined to the proper
dimensions. Apply a quality high temperature Anti-Seize lubricant to the snout tip threads. For
flanged configuration units, apply Anti-Seize to mounting bolt threads and use proper Buttonseal
gasket and install on transducer snout. Install unit into the process connection. (Do NOT torque
transmitter into the hole at this time!) Allow time for the transmitter snout temperature to
equalize to the process temperature. This will help eliminate thread galling and ease removal
later. There should be NO pressure applied at this time.
2. Connect power to the transmitter. For a 2 wire conduit output configuration, Red wire is Sig+/Exc +,
Black wire is Sig-/Exc-, Green wire is Ground. For a 6 pin connector version, Pin A is Sig+/Exc+ and
pin B is Sig-/Exc-. Insure proper loop supply voltage is applied to transmitter.
3. After temperatures have equalized, apply proper torque as described in Section 5.2 of the Manual
and tighten transmitter into mounting hole.
In hazardous areas do NOT remove screws when circuit is live.
4. Remove zero push-button seal screw.
5. To perform a Zero Calibration, use a 2 mm or smaller allen key and insert into push-button hole to
make contact with push-button at the bottom. Depress the button for 1/2 second, release, then
push again for 1/2 second.
6. Verify loop output is zero (4 mA).
7. Replace the Seal Screw.
Seal screw must remain in place to retain Explosion Proof certification.