EasyManua.ls Logo

EasyStand Zing - Unit Placement and Optional Connections

EasyStand Zing
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
7
8
7. Place unit onto its wheels as shown, and
lock casters.
8. If the Gas Spring Lockout was ordered,
unlock the gas spring by pulling the plunger.
(see page 33)
If the Gas Spring Lockout was not ordered,
remove the bolt from the lower part of the
cylinder on the mast as shown, discard bolt.
If the Pow’r Up Lift was ordered, plug the
battery and controller in.
See Fig. B on page 22 for information on
the Pow’r Up Lift.
9. Remove the nut, bolt and two washers
from the brace. These will be used in steps
10-15.
Page 5
Page 34
Parts Detail- MPS