EasyManua.ls Logo

Eaton RTLO-16913A User Manual

Eaton RTLO-16913A
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation Guide
Eaton PTO Information Guide
TRIG2600 EN-US
August 2017

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Eaton RTLO-16913A and is the answer not in the manual?

Eaton RTLO-16913A Specifications

General IconGeneral
BrandEaton
ModelRTLO-16913A
CategoryMicrophone system
LanguageEnglish

Summary

General Information

PTO Adapters

PTO Configurations

Heavy-Duty Automated - AutoShift / UltraShift / UltraShift PLUS 10-Speeds PTO Configurations

PTO configurations for automated 10-speed transmissions, including AutoShift, UltraShift, and UltraShift PLUS models.

Heavy-Duty Automated - Fuller Advantage Series PTO Configurations

PTO configurations for Fuller Advantage Series heavy-duty automated transmissions, covering various models.

Heavy-Duty Automated - UltraShift PLUS - VCS and VMS PTO Configurations

PTO configurations for UltraShift PLUS VCS and VMS heavy-duty automated transmissions, detailing specific models.

Heavy-Duty Automated - AutoShift / UltraShift / UltraShift PLUS 13/16/18-Speed PTO Configurations

PTO configurations for heavy-duty automated 13/16/18-speed transmissions, including various AutoShift and UltraShift models.

Heavy-Duty Automated - Endurant PTO Configurations

PTO configurations for Heavy-Duty Automated Endurant transmissions, detailing models like EEO-14F112C.

Cable Configuration

PTO Interface

UltraShift® PLUS and FA PTO Inputs and Configurations

PTO input and configuration for UltraShift PLUS and FA transmissions, detailing countershaft, thru-shaft, and split shaft PTOs.

Endurant - PTO Inputs and Configurations

PTO inputs and configurations for Endurant transmissions, including engagement sequences and auto neutral features.

J1939 PTO Installation with Hardwire Confirm

Wiring diagram for J1939 PTO installation with hardwire confirmation, showing OEM ECU, TCM, and module connections.

PTO w/Confirm Switched to Chassis GND

Wiring schematic for PTO control using chassis ground, detailing switch, relay, and TCM connections.

PTO w/Confirm Switched to Power

Wiring schematic for PTO control switched to power, showing relays, switches, and TCM connections.

PTO Operation

AutoShift Countershaft and Split Shaft PTO Operation

Instructions for operating AutoShift countershaft and split shaft PTOs for stationary and mobile applications.

UltraShift® Countershaft PTO Operation

Operating procedures for UltraShift countershaft PTOs, covering stationary and mobile applications with RPM requirements.

Inertia Brake

Inertia Brake Right-Hand Mounting Installation Instructions - Medium-Duty

Step-by-step instructions for mounting the medium-duty inertia brake to the right side of the transmission.

Generation 2 - Inertia Brake Relocation Instructions - Heavy-Duty (8- to 6-Bolt PTO Opening)

Instructions for relocating the inertia brake from an 8-bolt to a 6-bolt PTO opening for Gen 2 heavy-duty transmissions.

Generation 3 - Inertia Brake Relocation Instructions - Heavy-Duty (8 to 6-Bolt PTO Opening)

Instructions for relocating the inertia brake from an 8-bolt to a 6-bolt PTO opening for Gen 3 heavy-duty transmissions.

Related product manuals